Term 252
Development of a Regenerative Turbochoke System for Autonomous Wellsite Power Generation in High-Pressure Gas Wells
Project Type: Self-Initiated
Project Description
The Regenerative Turbochoke System is an integrated multidisciplinary solution designed for autonomous wellsite power generation and pressure regulation in high-pressure gas wells. Conventional wellhead systems typically utilize purely dissipative choke valves that waste pressure energy. This project proposes a Concept configuration, integrating a turboexpander upstream of a choke valve to recover electrical energy while ensuring stable outlet pressure for production facilities.
Download Poster
Project Team
Sajjad Ali Al Mahmud
CIERaian Mohammed Alamrani
ME
Ahmed Khalid Alghomlas
EE
Muath Mohammed Zenni
PETE
Abdulaziz Ahmed Munthiri
PETEMohsen Salem Jaber Almalki
CHETeam Coach
DR. Ahmed Mahmoud
Assistant ProfessorPetroleum Engineering Dept.
Department of Petroleum Engineering