Optimization of Steam Distribution System Through Utilization of Lost Pressure

Project Type: Self-Initiated

Project Description

Background: Sabic Utility uses 7 boilers to produce steam at various levels for use in chemical plant Three levels of steam: HP, MP, and LP Problem statement: The reliance of pressure-reducing valves and DS wastes the thermal potential energy of high-pressure steam. No alternative pathway for the steam in case of maintenance or shutdown. Proposed solution: Proposes a bypass system with a steam turbine to recover lost energy, improving efficiency. Enhances mechanical power generation and provides operational flexibility.


Download Poster

Project Team

Hussin Taleb Almasoud
Hussin Taleb Almasoud
Applied Mechanical Engineering
Faisal Mohammed Almesned
Faisal Mohammed Almesned
Chemical Engineering
Mohammad Dhahi Al Qahtani
Mohammad Dhahi Al Qahtani
Petrochemical Engineering
Kumail Hasan Al Mashal
Kumail Hasan Al Mashal
Applied Mechanical Engineering
Salman Ali Shebam
Salman Ali Shebam
Civil Engineering

Team Coach

Dr. Hammad R. Khalid
Dr. Hammad R. Khalid
Assistant Professor

Department of Civil and Environmental Engineering

Interdisciplinary Research Center for Construction and Building Materials