Term 222
Waste Treatment and Safety Management "Gold Mining Industry"
Project Type: Self-Initiated
Project Description
Wastewater treatment and the extraction of heavy metals (As, Fe, Cu) from the mine tailings and the integration of safety for the mining operation. In conclusion, the treatment of stored mine tailings proved to be successful. Production of 74 2 m3/day of treated water was obtained. Furthermore. treatment time took approximately 45 minutes. Finally, the overall reliability of the equipment was found to be 0.69
Download Poster
Project Team
ABDULAZIZ HAKAMI
CE
MAJED ALRASHIDI
CHEMOHAMED IBRAHIM
CHEAYED ALHARTHI
CERAYAN ALTHUAIBI
CETeam Coach
DR. Umer Zahid
Associate ProfessorChemical Engineering Dept.
Interdisciplinary Research Center for Membranes and Water Security